Cloud Migration Service (CT-CMS)

Network Test

2024-12-26 09:27:12

On the Migration Task Configuration page, click Source Server to check whether the network connection between the platform and the source server is normal, and click Target Server to check whether the network connection between the source and target servers is normal. Click the button to start the test. The button turns to the loading state. After the result is returned, the "" icon is displayed if the communication test is successful, or the "×" icon is displayed. You can see the test result intuitively.


4uM5a1fmNcna