The platform can automatically generate a report when a migration task is completed or canceled.
The CMS can generate reports when a single or multiple migration tasks are completed. The report for a single migration task contains the total time required for each migration step, data volume, operating system version, IP addresses of source and target servers, task status, and task configurations. The migration report for multiple tasks contains the number of servers to be migrated, the average completion time, and the specific information about a migration task for each source server.