Physical Server

Power On

2024-12-12 06:34:23

Scenario

You must power on the physical server again to take changes to the configuration into effect.

Before You Begin

The physical server is shut down.

Operation Steps

1.         Log in to the console.

2.         Click  at the top of the console, and select a region. In this topic, Hong Kong 2 is selected.

3.         In the left-side navigation pane, click Service List, and go to Computing > Physical Server.

4.         Check the checkbox in the first column corresponding to the target physical server and click Power On in the upper left corner of the physical server list page. The following figure shows the details.

5.         The status of the target server changes to Powering On and the target physical server is successfully powered on when the status changes to Running.